Warehouse internal gutter failure over live stock

Roof type: Long-run steel with internal box gutter

After: Warehouse internal gutter failure over live stock
Before: Warehouse internal gutter failure over live stock
BeforeAfter

Warehouse internal gutter failure over live stock

East Tāmaki, Auckland

Commercial

Same day

Make-safe response

5 days

Permanent repair

0

Further ingress events

The problem

Water entering over racked stock during a heavy rain event. The internal box gutter was overflowing into the building through corroded joints.

The diagnosis

Emergency inspection found a silted gutter with failed joint soldering and no overflow provision — a design flaw waiting for exactly this storm.

The repair

Same-day make-safe: gutter cleared and temporary lining installed. Permanent works within the week: full butyl relining, new outlet, and dedicated overflow provision sized for cloudburst events.

The result

No further ingress through subsequent storms. Client moved all three of their sites onto a scheduled maintenance contract.

Tarped by mid-morning, permanently fixed within the week.

David K., Facilities Manager